The Ministry of Electricity and Water and Ministry of Public Works started Sunday the operation of a solar power generation project to provide their premises with their needs of power. "The project is an initiative taken by the ministries to enter into the era of renewable energy," Minister of Electricity and Water and Minister of Public Works Abdulaziz Al-Ibrahim said in a speech at the project launching ceremony. He added that the concept of using solar energy as a clean and renewable source of energy should be generalized and applied by the different state buildings. He stated that the project is also part of Kuwait 2030 strategy that aims to at least 1 percent of its energy needs through solar power projects. The Minister pointed out that nearly 4094 solar panels have been installed on the roofs of buildings to produce 1 megawatt, or 500 kilos for each building. Another project with a capacity of 3.5 megawatts would be put forward for tender shortly, he unveiled
GMT 12:00 2018 Wednesday ,28 November
6th Gulf Intelligence Oman Energy Forum opensGMT 13:32 2018 Thursday ,22 November
Russia's Sovcomflot considers acquiring LNG-fueled shipsGMT 08:21 2018 Monday ,19 November
Russia expects new joint energy projects with VietnamGMT 09:34 2018 Sunday ,18 November
US, Japan, Australia, NZ to bring electricity to Papua New GuineaGMT 13:27 2018 Wednesday ,17 October
Russia ready to revive energy dialogue with European UnionGMT 23:11 2018 Thursday ,11 October
GCC renewable energy discussed in KuwaitGMT 18:00 2018 Thursday ,11 October
Strategic nuclear forces’ drills held in RussiaGMT 10:47 2018 Wednesday ,10 October
Egypt can generate up to 53% of power sources by 2050Maintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2021 ©
Maintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2021 ©
Send your comments
Your comment as a visitor