spacex replaces engine clears rocket for tuesday launch
Last Updated : GMT 06:49:16
Arab Today, arab today
Arab Today, arab today
Last Updated : GMT 06:49:16
Arab Today, arab today

SpaceX replaces engine clears rocket for Tuesday launch

Arab Today, arab today

Arab Today, arab today SpaceX replaces engine clears rocket for Tuesday launch

Florida - Arabstoday

KENNEDY SPACE CENTER, Fla.--SpaceX engineers have cleared the company's Falcon 9 rocket and Dragon cargo capsule for another try tomorrow to kick off NASA's first commercial flight to the International Space Station. The engineers replaced a suspect valve in an engine that triggered a last-second launch abort Saturday and carried out a data review to make sure there were no other problems, clearing the way for a second attempt. With forecasters predicting an 80 percent chance of good weather, the 178-foot-tall Falcon 9 is scheduled for liftoff from launch complex 40 at the Cape Canaveral Air Force Station at 3:44:38 a.m. EDT. As with Saturday's aborted countdown, the flight control team must launch the rocket on time, directly into the plane of the space station's orbit, to pull off the long-awaited rendezvous and docking. If the countdown is interrupted or held up for any reason, the flight will slip to Friday. This will be SpaceX's second Dragon test flight -- the third for the Falcon 9 rocket -- but the first to go all the way to the International Space Station. SpaceX holds a $1.6 billion contract with NASA to launch at least 12 unmanned cargo missions to the lab complex, but only after test flights confirm the safety and reliability of the rocket and cargo capsule. The test flights are being carried out under a contract valued at up to $396 million. Three missions originally were planned, but after a successful test flight in December 2010, SpaceX convinced NASA to combine the second and third tests into a single mission. As a result, the Dragon scheduled for launch tomorrow will spend much of the day Thursday carrying out maneuvers near the station to test the craft's flight control computers and navigation systems, and to check out the critical communications link between the station crew and the spacecraft. If all of that goes well -- work originally planned for the second of the three initial proposed test flights -- SpaceX flight controllers will attempt the final phases of the rendezvous on Friday to complete the objectives of the third test flight, guiding the craft to a point within about 30 feet of the space station. At that point, flight engineer Donald Pettit, operating the station's robot arm, will lock onto the cargo capsule just after 8 a.m. and guide it to a berthing at the Earth-facing port of the forward Harmony module. "This is a fairly challenging mission, putting all those objectives together," said Mike Horkachuck, SpaceX project executive for NASA. "But we've done a lot of work with SpaceX and our mission ops teams are both coordinating very well and we believe we've got a good chance of meeting all those objectives with this flight." The station crew plans to open hatches leading into the Dragon capsule on Saturday to begin unloading about 1,500 pounds of equipment and supplies. Assuming an on-time launch and successful berthing, the spacecraft will be unloaded and detached from the station on May 31 and guided to a parachute-assisted splashdown in the Pacific Ocean off the coast of California. SpaceX originally hoped to launch the mission in early February, but the flight was repeatedly delayed, primarily to give engineers additional time to make sure the flight software was ready for action. During the first actual launch attempt Saturday, the countdown ticked smoothly to zero and all nine first-stage engines ignited and throttled up for liftoff. But at the last instant -- just a half-second before the Falcon 9 was to be released from the pad -- increasing pressure in engine No. 5's combustion chamber triggered a computer-ordered abort. "During rigorous inspections of the engine, SpaceX engineers discovered a faulty check valve on the Merlin engine," SpaceX said in a statement. "The failed valve was replaced on Saturday and after thorough analysis the vehicle has been cleared for launch."

arabstoday
arabstoday

Name *

E-mail *

Comment Title*

Comment *

: Characters Left

Mandatory *

Terms of use

Publishing Terms: Not to offend the author, or to persons or sanctities or attacking religions or divine self. And stay away from sectarian and racial incitement and insults.

I agree with the Terms of Use

Security Code*

spacex replaces engine clears rocket for tuesday launch spacex replaces engine clears rocket for tuesday launch

 



Name *

E-mail *

Comment Title*

Comment *

: Characters Left

Mandatory *

Terms of use

Publishing Terms: Not to offend the author, or to persons or sanctities or attacking religions or divine self. And stay away from sectarian and racial incitement and insults.

I agree with the Terms of Use

Security Code*

spacex replaces engine clears rocket for tuesday launch spacex replaces engine clears rocket for tuesday launch

 



GMT 04:42 2012 Saturday ,31 March

What to expect

GMT 06:46 2017 Monday ,06 March

As sun comes out in Mosul, Iraqi forces launch

GMT 15:03 2017 Monday ,06 November

Louvre Abu Dhabi gears up for launch

GMT 15:55 2017 Tuesday ,08 August

Hamada Helal ended filming “Hamza’s Bag”

GMT 20:32 2017 Sunday ,29 October

Dollar exchange rate stable at major banks

GMT 09:57 2017 Wednesday ,04 October

Boris Johnson under fire for 'dead bodies' Libya gaffe

GMT 00:25 2016 Tuesday ,13 December

Finance Minister English Sworn in as New Zealand's PM

GMT 10:22 2017 Monday ,03 April

Asian markets start week with gains

GMT 08:33 2017 Monday ,06 March

Suns, Jazz, Pacers win in wild NBA finishes

GMT 05:48 2016 Wednesday ,17 August

Audi to make cars that can talk to traffic signals
Arab Today, arab today
 
 Arab Today Facebook,arab today facebook  Arab Today Twitter,arab today twitter Arab Today Rss,arab today rss  Arab Today Youtube,arab today youtube  Arab Today Youtube,arab today youtube

Maintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2021 ©

Maintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2021 ©

arabstoday arabstoday arabstoday arabstoday
arabstoday arabstoday arabstoday
arabstoday
بناية النخيل - رأس النبع _ خلف السفارة الفرنسية _بيروت - لبنان
arabstoday, Arabstoday, Arabstoday