japan\s nuclear operator plans \shutdown\ in 69 months
Last Updated : GMT 06:49:16
Arab Today, arab today
Arab Today, arab today
Last Updated : GMT 06:49:16
Arab Today, arab today

Government urges speed

Japan's nuclear operator plans 'shutdown' in 6-9 months

Arab Today, arab today

Arab Today, arab today Japan's nuclear operator plans 'shutdown' in 6-9 months

Radiation from the Fukushima plant has leaked into the air, soil and sea
Tokyo - AFP  

Radiation from the Fukushima plant has leaked into the air, soil and sea Tokyo - AFP   Japan's embattled Tokyo Electric Power Co (TEPCO) offered the timeline more than five weeks after a giant quake and tsunami knocked out cooling systems at its six-reactor Fukushima Daiichi atomic power station. Radiation has since leaked into the air, soil and sea from the coastal plant northeast of Tokyo, as emergency crews have doused overheating reactors and fuel rod pools to prevent full meltdowns of volatile fuel rods. TEPCO's chairman Tsunehisa Katsumata said at a press conference that the utility aims to cool reactors and start reducing radiation from the explosion-charred facilities within three months. Within six to nine months, TEPCO said in a statement, it expects to achieve "cold shutdowns" of all the six reactors, a stable condition in which temperatures drop and radiation leaks fall dramatically. "As the short-term targets, we have set two steps," said Katsumata. "Step one is to steadily reduce the amount of radiation. "In step two, we aim to control the release of radioactive substances and greatly control the amount of radiation." "There are various risks ahead," he added. "But we aim to complete step one in about three months and step two in another three to six months." TEPCO also said that an initial focus would be on preventing new hydrogen explosions in reactors by injecting nitrogen, and on avoiding further releases of radioactive water into the environment. Trade and industry minister Banri Kaieda said: "TEPCO has just unveiled the roadmap, which is an important step." Kaieda said that the roadmap would help move the nuclear crisis from the emergency phase into a stabilisation phase. "The government urges TEPCO to carry out the roadmap steadily or carry it out faster than planned," he said. Kaieda also said that in six to nine months the government would review the evacuation area around the plant, having set a 20 kilometre (12 mile) exclusion zone and urged people to also leave from a wider 30 km radius.

arabstoday
arabstoday

Name *

E-mail *

Comment Title*

Comment *

: Characters Left

Mandatory *

Terms of use

Publishing Terms: Not to offend the author, or to persons or sanctities or attacking religions or divine self. And stay away from sectarian and racial incitement and insults.

I agree with the Terms of Use

Security Code*

japan\s nuclear operator plans \shutdown\ in 69 months japan\s nuclear operator plans \shutdown\ in 69 months

 



Name *

E-mail *

Comment Title*

Comment *

: Characters Left

Mandatory *

Terms of use

Publishing Terms: Not to offend the author, or to persons or sanctities or attacking religions or divine self. And stay away from sectarian and racial incitement and insults.

I agree with the Terms of Use

Security Code*

japan\s nuclear operator plans \shutdown\ in 69 months japan\s nuclear operator plans \shutdown\ in 69 months

 



GMT 20:28 2017 Tuesday ,07 November

Rahma create winter clothes in innovative way

GMT 21:53 2017 Monday ,04 September

Ajman Chamber, DED-Dubai ink MoU on Empay

GMT 20:24 2017 Monday ,24 April

Bahrain participates in Arab Media Forum

GMT 23:44 2017 Friday ,17 November

Senior Chinese envoy in N. Korea amid chill in ties

GMT 12:09 2012 Wednesday ,05 September

Emma Watson talks body image

GMT 03:32 2017 Thursday ,12 October

A magnitude 6.0 earthquake strikes disasterhit Ecuador

GMT 06:57 2017 Friday ,13 October

Spain marks national day with show of unity

GMT 20:58 2017 Tuesday ,03 October

Injured Uchimura's reign ends at Gymnastics Worlds

GMT 08:45 2017 Saturday ,05 August

Mashael to end her new album for 2017

GMT 15:41 2017 Tuesday ,25 July

Coach withdrew his resignation after a call
Arab Today, arab today
 
 Arab Today Facebook,arab today facebook  Arab Today Twitter,arab today twitter Arab Today Rss,arab today rss  Arab Today Youtube,arab today youtube  Arab Today Youtube,arab today youtube

Maintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2021 ©

Maintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2021 ©

arabstoday arabstoday arabstoday arabstoday
arabstoday arabstoday arabstoday
arabstoday
بناية النخيل - رأس النبع _ خلف السفارة الفرنسية _بيروت - لبنان
arabstoday, Arabstoday, Arabstoday