fukushima workers checking 300 tanks for more leaks
Last Updated : GMT 06:49:16
Arab Today, arab today
Arab Today, arab today
Last Updated : GMT 06:49:16
Arab Today, arab today

Fukushima workers checking 300 tanks for more leaks

Arab Today, arab today

Arab Today, arab today Fukushima workers checking 300 tanks for more leaks

Tokyo - AFP

Workers at Japan's crippled Fukushima nuclear plant on Thursday scrambled to check 300 tanks storing highly radioactive water after one sprang a leak that is feared to have spread into the Pacific. Some 300 tonnes of radioactive water was believed to have seeped from one of the tanks that hold water used to cool the broken reactors, while operator Tokyo Electric Power Co (TEPCO) warned some of the water might have flowed into the ocean. "We are hurriedly checking if some 300 tanks of the same type holding contaminated water have the same leak problem," a TEPCO spokesman said. "We have finished pumping out water from the troubled tank, while we have continued removing the soil soaked by the water," the spokesman said. Spokesman Tsuyoshi Numajiri said Wednesday that traces of radioactivity were detected in a drainage stream. "There is a possibility that contaminated earth and sand contaminated flowed into the drainage. We cannot rule out the possibility that part of the contaminated water flowed into the sea," he said. On Wednesday, nuclear regulators said the leak represented a level-three "serious incident" on the UN's seven-point International Nuclear Event Scale (INES), which measures radiation accidents. The alert was raised from level one, which indicates an "anomaly". It is the most serious single incident since the quake and tsunami-sparked meltdowns at the plant in March 2011, which was a level-seven. The Chernobyl disaster in 1986 is the only other incident to have been ranked as serious. TEPCO has said puddles of water near the tank were so toxic that anyone exposed to them would receive the same amount of radiation in an hour that a nuclear plant worker is allowed to receive in five years. Thursday's safety checks came after Nuclear Regulation Authority (NRA) chairman Shunichi Tanaka on Wednesday voiced concern about similar leaks from other tanks. "We must carefully deal with the problem on the assumption that if one tank springs a leak the same thing can happen at other tanks," he said. The company -- which faces huge clean-up and compensation costs -- has struggled to cope with the disaster. Its most serious problem is how to handle the massive amount of water accumulating as a result of continuing water injections to cool the reactors, which has been stored in the hastily built tanks.

arabstoday
arabstoday

Name *

E-mail *

Comment Title*

Comment *

: Characters Left

Mandatory *

Terms of use

Publishing Terms: Not to offend the author, or to persons or sanctities or attacking religions or divine self. And stay away from sectarian and racial incitement and insults.

I agree with the Terms of Use

Security Code*

fukushima workers checking 300 tanks for more leaks fukushima workers checking 300 tanks for more leaks

 



Name *

E-mail *

Comment Title*

Comment *

: Characters Left

Mandatory *

Terms of use

Publishing Terms: Not to offend the author, or to persons or sanctities or attacking religions or divine self. And stay away from sectarian and racial incitement and insults.

I agree with the Terms of Use

Security Code*

fukushima workers checking 300 tanks for more leaks fukushima workers checking 300 tanks for more leaks

 



GMT 11:50 2017 Wednesday ,22 February

2 Additional N. Koreans Identified as Being Linked

GMT 17:39 2017 Saturday ,02 September

Minister underlines support for OPEC cut deal

GMT 03:39 2017 Sunday ,24 September

6 arrested over extremist recruitment in Russia

GMT 02:26 2017 Thursday ,23 November

Al Hariri returns to Lebanon and abandons resignation

GMT 21:33 2017 Friday ,29 September

Official underlines economic improvement

GMT 04:36 2017 Wednesday ,14 June

EU seeks post-Brexit powers over London finance

GMT 17:59 2017 Friday ,20 October

In Syria, student dreams shattered by war

GMT 11:30 2017 Thursday ,16 February

Four dynamic ways to style your family’s portraits

GMT 13:54 2015 Saturday ,24 October

Kuznetsova ends title drought at Kremlin Cup
Arab Today, arab today
 
 Arab Today Facebook,arab today facebook  Arab Today Twitter,arab today twitter Arab Today Rss,arab today rss  Arab Today Youtube,arab today youtube  Arab Today Youtube,arab today youtube

Maintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2025 ©

Maintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2025 ©

arabstoday arabstoday arabstoday arabstoday
arabstoday arabstoday arabstoday
arabstoday
بناية النخيل - رأس النبع _ خلف السفارة الفرنسية _بيروت - لبنان
arabstoday, Arabstoday, Arabstoday