removal of hydrogen starts at fukushima plant
Last Updated : GMT 06:49:16
Arab Today, arab today
Arab Today, arab today
Last Updated : GMT 06:49:16
Arab Today, arab today

Removal of hydrogen starts at fukushima plant

Arab Today, arab today

Arab Today, arab today Removal of hydrogen starts at fukushima plant

Tokyo - Qna

Tokyo Electric Power Company will try to remove more hydrogen from the troubled Fukushima Daiichi nuclear power plant on Sunday. The density of the gas increased in pipes connected to the No. 1 reactor after a significant drop on Saturday. Last month, TEPCO found that hydrogen had built up inside pipes leading to the No. 1 reactor containment vessel and its density was between 61 and 63 percent of the total gas present. This poses a problem because releasing high densities of hydrogen outside the reactor building could cause another explosion, Japan''s (NHK World) website reported. On Saturday, TEPCO spent one hour removing hydrogen, while at the same time injecting nitrogen to the pipes to reduce the risk of an explosion. About half an hour later, the company found the percentage of hydrogen had dropped to nearly zero. However 2 hours later, the density was measured at 3.9 percent. Even though TEPCO said an explosion is unlikely, hydrogen at a density of over 4 percent could cause a blast when mixed with oxygen. TEPCO believes that the hydrogen level rose because gas accumulated in the upper part of the pipes may have redistributed internally.

arabstoday
arabstoday

Name *

E-mail *

Comment Title*

Comment *

: Characters Left

Mandatory *

Terms of use

Publishing Terms: Not to offend the author, or to persons or sanctities or attacking religions or divine self. And stay away from sectarian and racial incitement and insults.

I agree with the Terms of Use

Security Code*

removal of hydrogen starts at fukushima plant removal of hydrogen starts at fukushima plant

 



Name *

E-mail *

Comment Title*

Comment *

: Characters Left

Mandatory *

Terms of use

Publishing Terms: Not to offend the author, or to persons or sanctities or attacking religions or divine self. And stay away from sectarian and racial incitement and insults.

I agree with the Terms of Use

Security Code*

removal of hydrogen starts at fukushima plant removal of hydrogen starts at fukushima plant

 



GMT 15:19 2017 Wednesday ,08 November

A well changes lives in ravaged Mali city

GMT 17:54 2018 Friday ,12 October

Florida town demolished by Hurricane Michael

GMT 02:59 2016 Tuesday ,20 September

Indian markets open flat

GMT 08:04 2017 Thursday ,19 October

Jordan condemns Mogadishu blasts

GMT 02:03 2017 Wednesday ,12 July

Egyptian police raid Al Jazeera unit again

GMT 15:25 2017 Tuesday ,21 November

Ratings boost for Saudi reform program

GMT 21:45 2017 Saturday ,21 January

Trump demands CIA to eliminate ISIS in Syria

GMT 13:19 2017 Wednesday ,29 March

Belstaff appoints Karla Otto
Arab Today, arab today
 
 Arab Today Facebook,arab today facebook  Arab Today Twitter,arab today twitter Arab Today Rss,arab today rss  Arab Today Youtube,arab today youtube  Arab Today Youtube,arab today youtube

Maintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2021 ©

Maintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2021 ©

arabstoday arabstoday arabstoday arabstoday
arabstoday arabstoday arabstoday
arabstoday
بناية النخيل - رأس النبع _ خلف السفارة الفرنسية _بيروت - لبنان
arabstoday, Arabstoday, Arabstoday