A disaster drill was held at the Fukushima Daiichi nuclear power plant by its operator Tokyo Electric Power Co. for the first time since the March earthquake and tsunami triggered the country''s worst nuclear accident there. The drill was conducted under the scenario that an earthquake with a magnitude of 8.0 occurred near the plant, disabling the reactor cooling system, such as the pumps providing water to the furnaces and a tank storing the decontaminated water for reuse to water the reactors, Japan''s News Agency (Kyodo) reported. About 30 people took part in the exercise designed to check a series of anti-disaster procedures ranging from measuring radiation levels to installing hoses to carry seawater to cool the reactors, the utility, or TEPCO, said. The government''s nuclear safety inspectors were also present.
GMT 10:54 2018 Sunday ,02 December
Egypt wins membership of World Water Council board of governorsGMT 13:57 2018 Thursday ,29 November
UN weather agency: 2018 is fourth hottest year on recordGMT 12:50 2018 Saturday ,27 October
Tsunami alert issued for Mediterranean coast as earthquake strikes off GreeceGMT 12:32 2018 Friday ,26 October
6.5-magnitude quake hits western Greece, no casualties reportedGMT 16:06 2018 Wednesday ,10 October
Schools in southern Oman close ahead of cyclone in the Arabian SeaGMT 17:56 2018 Saturday ,06 October
Cyclone is expected to develop into a tropical storm at UAEGMT 13:37 2018 Thursday ,04 October
Madbouly signing ceremony of project to support adaptation to climate changeGMT 08:50 2018 Wednesday ,24 January
Tsunami warnings as powerful quake hits off AlaskaMaintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2021 ©
Maintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2021 ©
Send your comments
Your comment as a visitor