petroleum min calls for speeding up implementation of 2nd phase of west delta gas production project
Last Updated : GMT 06:49:16
Arab Today, arab today
Arab Today, arab today
Last Updated : GMT 06:49:16
Arab Today, arab today

Petroleum min. calls for speeding up implementation of 2nd phase of West Delta Gas Production Project

Arab Today, arab today

Arab Today, arab today Petroleum min. calls for speeding up implementation of 2nd phase of West Delta Gas Production Project

Petroleum Minister Tareq el Moulla
Cairo - MENA

Petroleum Minister Tareq el Moulla called for expediting the implementation of the 2nd phase of gas production from West Delta gas fields (North Alexandria / West Mediterranean Deepwater).

This came during the 6th ordinary meeting of the higher committee to follow up the pace of work in the 2nd phase of the project that involves "Giza", "Fayyoum" and "Raven" oilfields.

In May, President Abdel Fattah El Sisi opened the first stage of the project that involved "Taurus" and "Libra" fields, the minister noted. 

The two fields produced 700 million cubic feet a day (bcf/d), the minister said, underlining that the first stage was implemented eight months ahead of schedule, a matter that helped decrease gas imports and secure the country's needs of natural gas. 

For his part, Chairman of British Petroleum (BP) Egypt Hesham Mekkawy said that his company is facing major challenges to speed up the implementation of the project to start production of "Fayyoum" and "Giza" fields by the end of 2018, with gas production estimated to reach nearly 400 million cubic feet a day (bcf/d).

The West Nile Delta development project includes five gas fields across the North Alexandria and West Mediterranean Deepwater offshore concession blocks. It is being developed as two separate projects to enable BP and its partners to accelerate gas production commitments to Egypt. 

When fully onstream in 2019, combined production from both projects is expected to reach up to almost 1.5 billion cubic feet a day (bcf/d), equivalent to about 30 percent of Egypt’s current gas production. All the gas produced will be fed into the national gas grid.

arabstoday
arabstoday

Name *

E-mail *

Comment Title*

Comment *

: Characters Left

Mandatory *

Terms of use

Publishing Terms: Not to offend the author, or to persons or sanctities or attacking religions or divine self. And stay away from sectarian and racial incitement and insults.

I agree with the Terms of Use

Security Code*

petroleum min calls for speeding up implementation of 2nd phase of west delta gas production project petroleum min calls for speeding up implementation of 2nd phase of west delta gas production project

 



Name *

E-mail *

Comment Title*

Comment *

: Characters Left

Mandatory *

Terms of use

Publishing Terms: Not to offend the author, or to persons or sanctities or attacking religions or divine self. And stay away from sectarian and racial incitement and insults.

I agree with the Terms of Use

Security Code*

petroleum min calls for speeding up implementation of 2nd phase of west delta gas production project petroleum min calls for speeding up implementation of 2nd phase of west delta gas production project

 



GMT 13:26 2017 Thursday ,30 March

More whistle-blowers are talking to WADA

GMT 12:24 2017 Friday ,18 August

Saad became stronger after crisis

GMT 21:56 2016 Friday ,29 April

Irrigation Minister meets with IFAD mission

GMT 13:07 2011 Wednesday ,11 May

Ruby denies affair with J.Mubarak

GMT 12:14 2017 Wednesday ,01 November

Monster planet found orbiting dwarf star

GMT 13:00 2016 Wednesday ,12 October

Wu urges foreign adventure for China's flops

GMT 16:42 2017 Sunday ,19 March

ISIS imprisons Mousl’s civilians in basements

GMT 11:35 2011 Monday ,11 July

Iran, Azerbaijan to honor poet Shahriar

GMT 14:34 2016 Tuesday ,09 August

Florence Foster Jenkins

GMT 10:36 2017 Thursday ,13 April

Coppola, Haneke, Haynes films in lineup for Cannes

GMT 05:43 2017 Tuesday ,15 August

Japan Decides to Relax Arms Export Ban

GMT 04:22 2017 Monday ,02 October

EU battle heats up over controversial weedkiller

GMT 01:54 2017 Friday ,24 November

Iraq launches final sweep to flush out IS

GMT 12:40 2017 Monday ,08 May

Predators advance to Western Conference final

GMT 23:28 2017 Friday ,22 September

Seoul rejects Trump demand it pays for missile system

GMT 12:21 2017 Wednesday ,19 April

Ramez Galal’s new prank show is suffering

GMT 23:14 2017 Saturday ,18 March

Pope Francis to visit Egypt on April 28-29: Vatican

GMT 07:22 2018 Monday ,03 December

Qatar to withdraw from OPEC early 2019
Arab Today, arab today
 
 Arab Today Facebook,arab today facebook  Arab Today Twitter,arab today twitter Arab Today Rss,arab today rss  Arab Today Youtube,arab today youtube  Arab Today Youtube,arab today youtube

Maintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2021 ©

Maintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2021 ©

arabstoday arabstoday arabstoday arabstoday
arabstoday arabstoday arabstoday
arabstoday
بناية النخيل - رأس النبع _ خلف السفارة الفرنسية _بيروت - لبنان
arabstoday, Arabstoday, Arabstoday